J Water SRT - Aqua 53 (2004) 263-270
Design life of water transmission mains for exponentially growing water demand
Ashok K. Sharma and Prabhata K. Swamee
CSIRO MIT, PO Box 56 Highett 3129, Victoria, Australia E-mail: Ashok.Sharma@csiro.au
Department of Civil Engineering, Indian Institute of Technology Roorkee, Roorkee 247 667, India
ABSTRACT
Gravity or pumping water transmission lines are planned for a predetermined time horizon generally called design period. For a static population the lines can be designed, either for a design period equal to the life of the pipes sharing the maximum cost of the system or for the perpetual existence of the supply system. For a growing population or water demand, it is always economical to design the mains in staging periods and then strengthen the system after the end of every staging period. In the absence of a rational criterion, the design period of water supply mains is generally based on the designer's intuition, disregarding the useful life of the component sharing maximum cost, pattern of population growth or increase in water demand and discount rate. Provided herein are numerical criteria for the design period of water transmission mains.
Full article (PDF Format)
PAY-PER-VIEW: Buy this article for £20.00 (IWA MEMBER PRICE: £15.00)
|