IWA Publishing
 IWA Publishing Journals   Subscriptions   Authors   Users   Librarians   FAQs 

J Water SRT - Aqua 50 (2001) 91-100

Dover and Folkestone wastewater treatment scheme: design considerations and optimisation of the pressure surge control for Pumping Station PS2

A. P. Boldy and C. R. S. Tordoff

HYDROSIM Consultants Limited, Rowendene, Walton Way, Wellesbourne, Warwick CV35 9RD, UK Tel/Fax: +44 (0)1789 470827 E-mail: apb@hydrosim.co.uk

Mott MacDonald, Demeter House, Station Road Cambridge CB1 2RD, UK Tel: +44 (0)1223 463500 Fax: +44 (0)1233 461007 E-mail: mew@mm-camb.mottmac.com


ABSTRACT

The paper presents a brief overview of the design considerations for the Dover and Folkestone Wastewater Treatment Scheme, which is being implemented by Southern Water to meet the requirements of the EU Bathing Water and Urban Wastewater Treatment Directives.The design considerations for the pumping station PS2 and the delivery pipeline to the treatment works at Broomfield Bank are discussed, together with the pressure surge investigation.


Full article (PDF Format)


PAY-PER-VIEW: Buy this article for £23.5 (IWA MEMBER PRICE: £17.62) - All prices include VAT
Checkout